Ask Dock.AI · Massachusetts (MA)

Massachusetts dock permits: who actually issues yours

Waterfront permitting in Massachusetts is not one rule. Here is the authority that controls the permit, what rides along with it, and the official source — before you build anything.

Primary permit gate
Massachusetts DEP / Local Conservation Commissions — Waterways (Chapter 91) / Wetlands
State program
Primary state programMassachusetts DEP / Local Conservation Commissions — Waterways (Chapter 91) / Wetlands
What triggers it
Water-dependent structures may require Chapter 91 licensing/permitting and local/state wetlands review; some small residential/seasonal structures may use simplified paths.

Watch for this in Massachusetts

Chapter 91 and the Wetlands Protection Act are separate approvals. On a great pond, clearing Chapter 91 alone is not enough.

The state agency below is the main permit path. On reservoirs and lakes owned by a utility, the Corps or another operator, check who owns the water first. The owner can be the real permit gate.

Layers that can apply

  • Town or county — local zoning, shoreland and building permits.
  • Waterbody owner or operator — reservoirs, utility lakes, river authorities and lake associations.
  • State — Massachusetts DEP / Local Conservation Commissions (Chapter 91 + Wetlands Protection Act + local Conservation Commission).
  • Federal — Army Corps of Engineers, see below.

The detailed rules we check

ProjectWhat the rule saysCitation
Residential Dock / PierA small structure accessory to a residence may qualify for the Chapter 91 simplified-license procedure when it is no more than 600 sq ft measured below mean high water (coastal) or ordinary high water (inland), is water-dependent, involves no fill, and was built or substantially altered after January 1, 1984.310 CMR 9.10
Seasonal Floating Dock / Float / RaftA qualifying bottom-anchored seasonal floating dock/float/raft with no piles may be authorized annually by a municipality that actually operates a §10A program. The local permit expires December 31.M.G.L. c.91 §10A; 310 CMR 9.07; 310 CMR 9.02
ALL Waterfront/Wetland WorkRemoval, dredging, filling or alteration of wetlands is prohibited without authorization.M.G.L. c.131 §40 / 310 CMR 10.00
ALL Waterfront/Wetland WorkTo obtain an Order of Conditions for work altering protected wetland resources, applicant submits a Notice of Intent to the local Conservation Commission and MassDEP.WPA Form 3
Applicability CheckWhen it is uncertain whether the site/work is in or will alter a wetland resource area, the applicant can file WPA Form 1, Request for Determination of Applicability, with the local Conservation Commission.WPA Form 1 — Request for Determination of Applicability

Federal layer (applies in every state)

  • Rivers and Harbors Act §10 — a structure in, over or under navigable waters of the United States needs Army Corps authorization unless a general or nationwide permit covers it.
  • Clean Water Act §404 — placing fill or dredged material in waters of the United States needs Corps authorization (Michigan and New Jersey run this program in certain waters).
  • 2026 Nationwide Permits — effective March 15, 2026. Some docks qualify, sometimes with a pre-construction notice. Regional conditions apply.
  • Clean Water Act §401 — a state water-quality certification that rides on a federal permit. It is not a dock permit by itself.

Sources: USACE Regulatory Request System · EPA — CWA §401 · USACE Nationwide Permits · Last verified 2026-09-14

Contact the permit office

  • MassDEP Waterways Program (Chapter 91)
    Email [email protected] · Source
  • MassDEP Southeast Regional Office
    Phone 508-946-2700 · Source
  • MassDEP Western Regional Office
    Phone 413-784-1100 · Source

Contacts read on each office's official site · verified 2026-10-30. Call before you design: many offices route dock questions by region or by lake.

Official sources

Massachusetts DEP / Local Conservation Commissions — mass.gov · Massachusetts DEP / Local Conservation Commissions (second source) — mass.gov · Last verified 2026-09-14

Questions? Call 207-600-2705.

Preliminary regulatory path. Ask Dock.AI is an information tool, not a permitting authority. Rules change and every waterbody has its own owner and wrinkles. Confirm your project with the listed authority before you build. You pull your own permit; we show you the path. Ask Dock.AI is powered by Alummikon — engineered aluminum docks, stairs and waterfront access, built in Maine.