Ask Dock.AI · Texas (TX)
Texas dock permits: who actually issues yours
Waterfront permitting in Texas is not one rule. Here is the authority that controls the permit, what rides along with it, and the official source — before you build anything.
Primary permit gate
GLO for coastal sovereign-submerged-land projects; inland river authorities / USACE / utility operators
State program
Coastal zone onlyTexas General Land Office — Coastal Leasing & Easements
What triggers it
Residential piers/boat lifts on state-owned submerged coastal land may require registration/authorization; commercial uses can require leases.
Watch for this in Texas
The General Land Office covers the coast only. Inland lakes are controlled by river authorities (LCRA, Brazos River Authority, TRWD, SRA), cities, utilities or the Corps.
The state program covers the coast. Inland lakes go to the lake operator. Lake operators that can be the real gate here: LCRA / Brazos River Authority / TRWD / SRA / USACE.
Layers that can apply
- Town or county — local zoning, shoreland and building permits.
- Waterbody owner or operator — reservoirs, utility lakes, river authorities and lake associations.
- State — Texas General Land Office (Coastal state-land lease/easement + local/waterbody authority).
- Federal — Army Corps of Engineers, see below.
Federal layer (applies in every state)
- Rivers and Harbors Act §10 — a structure in, over or under navigable waters of the United States needs Army Corps authorization unless a general or nationwide permit covers it.
- Clean Water Act §404 — placing fill or dredged material in waters of the United States needs Corps authorization (Michigan and New Jersey run this program in certain waters).
- 2026 Nationwide Permits — effective March 15, 2026. Some docks qualify, sometimes with a pre-construction notice. Regional conditions apply.
- Clean Water Act §401 — a state water-quality certification that rides on a federal permit. It is not a dock permit by itself.
Sources: USACE Regulatory Request System · EPA — CWA §401 · USACE Nationwide Permits · Last verified 2026-09-14
Contact the permit office
- Texas General Land Office - Coastal Leasing & Easements, Galveston Permit Service Center
Phone 409-741-4057 · Email [email protected] · Source - Texas General Land Office - Coastal Leasing & Easements, Corpus Christi Permit Service Center
Phone 361-886-1630 · Email [email protected] · Source
Contacts read on each office's official site · verified 2026-10-30. Call before you design: many offices route dock questions by region or by lake.
Official sources
Texas General Land Office — glo.texas.gov · Last verified 2026-09-14
Questions? Call 207-600-2705.
Preliminary regulatory path. Ask Dock.AI is an information tool, not a permitting authority. Rules change and every waterbody has its own owner and wrinkles. Confirm your project with the listed authority before you build. You pull your own permit; we show you the path. Ask Dock.AI is powered by Alummikon — engineered aluminum docks, stairs and waterfront access, built in Maine.